Approved For Release 2005/04/22 : Cl MEMORANDUM FOR: Assistant Directo#, Current Intelligence 25X11 ’ SUBJECT Preliminary Evaluation of Mission 1. These four missions provided extensive and generally excellent coverage of Laos and North Vietnam and limited cov~ erage of Chinese targets north of the Vietnamese border. In many cases, but particularly in Laos, coverage was repeti-~ tive. North Vietnam: 2, Twelve of the fifteen airfields covered in North Vietnam were major fields. Nearly all the transports the DRV owns--11 IL-14's and 20 LI-2's--were seen at Hanoi/Gia Lam while four Hound helicopters were seen at Kep. North Vietnam's new airfield at Phuc Yen, 12 miles north of Hanoi, now appears serviceable although no aircraft, elec- tronic defenses or revetments were seen. We still feel that this field is intended to serve as Hanoi's new inter- national terminal. 4, The missions also provided excellent photography of twenty-eight military complexes or installations, twenty-one supply or storage areas, and forty-four barracks areas. Most installations, such as Dien Bien_Phu, showed little, if any, change from previous coverage] é 25X1 NSA review(s) completed. 082-5 : 25X1 25X11 25X1 25X1 Approved For Release robo fea Sho Brbodeescor 0080011 0082-5 5. Some industrial construction was noted. A fairly extensive unidentified industrial installation is under construction in the Phu Lang Thuong area northeast of Hanoi. At Thai Nguyen, a major iron and steel plant is under construction and is about 50% complete. A military supply depot in this same complex has a total of 36 large camouflaged warehouses. 6. The only active defenses noted were at least 170 and possibly as many as 218 occupied anti-aircraft posi- tions. Of these, 121 were in the Hanoi area. One radar site, under continuing construction in the Thai Nguyen area, was confirmed by the photography, 7. As part of a continuing coverage of North Viet- nam's transportation net, these missions concentrated on railroads and bridges. A total of seventeen major rail- road marshalling yards were photographed, mostly on the rail lines radiating north of Hanoi to the Chinese border. Ten moving trains were photographed and a total of at least 850 railroad cars were noted at the various yards. Most of the rail lines appeared to be serviceable. There is extensive rail construction underway northeast of Hanoi near Kep on the major line between Hanoi and Ping- Hsiang, China.